Steel Scaffolding Truss Structure for Line Array Speakers Admin Edit

About steel scaffolding and truss rigging: ITSC truss offer all kinds of steel scaffoldings and truss rigging, as well as hoist rigging, mobile stages

  • Min. Order: 1 Set/Sets
  • Trade Term: FOB,EXW
  • Payment Terms: Paypal, L/C, T/T, WU, Money Gram
  • Place of Origin: Guangdong, China (Mainland)
  • Means of Transport: Ocean, Land
  • Production Capacity: 100sets/month
  • Packing: Carton / Air bulble

  • Product Description

    Product Attribute

    Steel scaffolding consists of pillars, horizontal pipe, diagonalized pipe, adjustable base, joint pipe,and it is simple and easy to assemble. And it is widely used in events: lifting the line array speaker, LED screen, adertisement posts, as well as different outdoor shows and events and concerts.

     

    Simple diagram for scaffolding parts.

     

    Item NameSteel scaffolding Structure
    BrandITSC
    MaterialQ235
    Surface TreatmentHot zinc galvanization
    Pillar Pipe48*3mm
    2m
    10.47kg
    Diagonal Pipe48*2.5mm
    2.3m
    7.6kg
    Horizontal Pipe48*3mm
    Adjustable Foot2.245kg
    Cross Section2*2m
    Height2m-38m

    Advantage
    Heavy loading capacity and stable, 
    Demountable,easy to assemble and transport
    Self-locking, non-rust
    ApplicationHanging line array speaker and led screen
    Ootdoor shows and events
    Packingstandard package or customized
    Delivery Time10 working days after 30% payment
    Payment termL/C,T/T,Western Union,MoneyGram

    1. Heavy loading capacity and stable, 

    2. Demountable,easy to assemble and transport

    3. Self-locking, non-rust

    because of the Accessories are not easy to be lost and Good stability, widely used in bridge construction

    support, hanging speaker, stage background, light frame and other fields.

    Our partners

    Negotiating

    Specification

    Quantity

    Price

    Packing

    Delivery   Time

    Terms   of Payment

    Claim   for Compensation

    Arbitration

    Sign   a contract

    Order   goods and stamp

    Transfer   payment

    Cash,   T/T, Western union, Money gram, L/C, ect

    Prepare   production

    PD   study the specification and start to arrange the production,

    Check   and Testing

    QC   checking and testing the quality

    Packing

    Generally   pack with bubble air or carton according to negotiation

    Step   1

    Material   Ready

    Step   2

    Material   Cutting

    Step   3

    Board   Cutting

    Step   4

    Punching

    Step   5

    Milling

    Step   6

    Welding

    Step7

    Checking

    Step   8

    Testing

    Step   9

    Packing

    By sea: 15-45 days acocording to different countries

    It takes 3-5 hours to set up with thespeaker towers

    1.     Clean, check and maintain your scaffolding on a regular basis.

    2.     Throw away the damaged or deformed scaffolding, spigot pins or couplers.

    3.     Make a structural calculation for each construction you build.

    4.     Store and transport your scaffolding on proper dolly.

    5.     Attach loads in node points.

    6.     Check how loads are attached to the speaker towers before lifting.

    1.     Mix scaffolding rigging of multiple suppliers in one construction, unless specifically stated by manufacturer.

    2.     Exceed the maximum loading of single spans as specified in the loading tables.

    3.     Exceed the given structural data of scaffolding.

    4.     Drill holes in the  tubes.

    5.     Use damaged scaffolding.

    6.     Attach loads to the scaffoldingdiagonals.

    1.     All goods are only factory competitive price guarantee and 100% quality inspection before delivery.

    2.     Instant feedback for any inquiry.

    3.     Professional designs and welding.

    4.     Quality satisfaction guarantee 100% return policy.

    5.     Sample or trial order is acceptable, Mixed order support, fast delivery.

    6.     Much rich experience in dealing with international trade and declaration with more than 8 years in this line.

    We have been designing and manufacturing event truss and stages many years. Our leading design teams and strict quality control systems ensure each product from ITSC truss is reliable and ideal deals. Our quality products have well met demands of all clients around the world.

    With our own factory and product line, ITSC truss can ensure the fastest delivery in the industry. What's more, we have accumulated rich resources in shipping channels, which also promise our fastest delivery time. Our standard cases can be finished within 7days and those custom-made within 8 days.

    We are committed to providing the most affordable products for all customers. We have our own factory and massive production line. This ensures that we can procure all materials at much lower price than our competitors.

    We promise all products from ITSC truss are the most affordable in the industry.

    Choose your most reliable supplier, choose ITSC truss!

    In a word, we are one of the most professional and reliable truss and stages suppliers in China. Please come to us!

     

    ITSC truss is  a professional supplier and solution provider of exhibition and display system, located in Guangzhou, China.Our factory is near Baiyun AirPort, about thirty minutes drive from Baiyun Airport to factory.


    Our products range includes standard and custom made exhibition booth,  and we also produce tension fabric fast trade show booth and aluminum truss system and layer.

     

    About trade show services in China, we also can make and sell alumninum truss exhibition booth for your needed booth building services in different exhibition centers in Guangzhou,Shanghai, Beijing, Guangzhou, Shenzhen.


    We believe that quality is the life of the factory.

     

    Providing the high-quality products is our company's responsibility.

     

    ITSC trus  is willing to co-operate with you and create the future brilliance together. Thank you!

     

    Welcome to Shanghai; Welcome to  ITSC truss

    Steel scaffolding in stock in our factory.

    Steel scaffolding structure for the stage lighting fixture and LED screen and line array sound system in concerts and big events!

    34x6x16m with 35000 kg ballast,13 led panels+2 line arrays susppended from scaffolding. Ringlock scaff system installed for AVB concert at Koltatta.

    Delivery Date: 5 working days Brand Name: ITSC
    Materials: Galvanized steel Main tubes: 48x3mm
    Size: 2x2x2m/set, other size customzed Other names: Layer truss/ Scaffolding
    Certificates: TUV/SGS approved Company type: Manufacturer
    ODM/OEM: Yes Original place: Guangzhou, China
    Price: Factory price/no dealer Market: Global
  • Min. Order: 1 Set/Sets
  • Trade Term: FOB,EXW
  • Payment Terms: Paypal, L/C, T/T, WU, Money Gram
  • Place of Origin: Guangdong, China (Mainland)
  • Means of Transport: Ocean, Land
  • Production Capacity: 100sets/month
  • Packing: Carton / Air bulble
  • Delivery Date: 5 working days
  • Brand Name: ITSC
  • Materials: Galvanized steel
  • Main tubes: 48x3mm
  • Size: 2x2x2m/set, other size customzed
  • Other names: Layer truss/ Scaffolding
  • Certificates: TUV/SGS approved
  • Company type: Manufacturer
  • ODM/OEM: Yes
  • Original place: Guangzhou, China
  • Price: Factory price/no dealer
  • Market: Global
  • Category: Concerts Trussing

    Related Category: Speaker Trusses  Multi-purpose Trussing